Skip to content
River City Engineering
  • About US
  • Services
    • Conceptual Studies
    • Project Engineering
    • Capacity and Debottlenecking Studies
    • Process Optimization
    • Process Safety Management
    • Pipeline Simulation and System Optimization
    • River City Software
    • River City Education
  • Our Team
  • Recent Work
    • Performance Testing
    • Plant Optimization
    • Safety Analysis
  • Clients
  • Blogs
    • Papers
    • Adding Value #16
    • Adding Value #15
    • Adding Value #14
    • Adding Value #13
  • Contact
  • About US
  • Services
    • Conceptual Studies
    • Project Engineering
    • Capacity and Debottlenecking Studies
    • Process Optimization
    • Process Safety Management
    • Pipeline Simulation and System Optimization
    • River City Software
    • River City Education
  • Our Team
  • Recent Work
    • Performance Testing
    • Plant Optimization
    • Safety Analysis
  • Clients
  • Blogs
    • Papers
    • Adding Value #16
    • Adding Value #15
    • Adding Value #14
    • Adding Value #13
  • Contact

Hydrogen Transition #1

Posted on February 18, 2022February 18, 2022 by kent

There has been a lot of dialogue and discussion lately on transitioning to hydrogen from natural gas. Much of this […]

Adding Value #26

Posted on February 11, 2022February 11, 2022 by kent

Doing what we do best. When we are onsite we are always looking out for problems with control logic that […]

Adding Value #25

Posted on October 8, 2021October 8, 2021 by kent

Quality control /assurance is sometime taken for granted. After all there is a minimum level of confidence that we expect […]

Adding Value #24

Posted on May 28, 2021June 2, 2021 by kent

A client was evaluating a used plant for an expansion project. Of course it was advertised as a great deal, […]

Adding Value #23

Posted on February 20, 2021February 20, 2021 by kent

Another recent client problem we were able to troubleshoot successfully dealt with a TEG dehydration system. The lean TEG out […]

Adding Value #22

Posted on January 22, 2021January 22, 2021 by kent

We performed an investigation for a client who had recently had a serious incident. Their wells flow through a sand […]

Adding Value #21

Posted on January 8, 2021January 8, 2021 by kent

About a year ago we did a plant evaluation for a client. One of the major findings was that to […]

Adding Value #20

Posted on November 13, 2020November 13, 2020 by kent

It’s amazing how some problems keep repeating themselves. That’s where the RCE experience and expertise comes into play for our […]

Adding Value #19

Posted on October 2, 2020October 8, 2021 by kent

Here at RCE, some times we’re so good at our job that we cost ourselves business. We had been engaged […]

Adding Value #18

Posted on September 18, 2020September 18, 2020 by kent

The RCE “rule” is that you must have a pre-alarm before a shutdown. The reason for this “rule” is that […]