Adding Value #14

A gas plant was utilizing all their residue compressors to process 200 MMSCFD when it designed to have one as a spare. RCE engineers took data and checked actual compressor performance against predicted performance and found that the compressors were actually operating unloaded even though the compressor panels indicated that they were loaded. The compressor vendor was called out and verified an issue with the unloaders. Once they were fixed the plant was able to lower DeC1 pressure which increased recoveries (~10%), lowered refrigeration duty, and lowered trim reboiler (hot oil) duty. Adding value is what we do best at RCE!

Recent Stories

Hydrogen Transition #1

There has been a lot of dialogue and discussion lately on transitioning to hydrogen from natural gas. Much of this discussion is centered on reusing

Read More

Adding Value #26

Doing what we do best. When we are onsite we are always looking out for problems with control logic that is causing equipment problems. Here

Read More

Adding Value #25

Quality control /assurance is sometime taken for granted. After all there is a minimum level of confidence that we expect in terms of quality from

Read More