Adding Value #7
Our client was notified by the NGL pipeline that they were going to be penalized for excessive methane (C1) in […]
Our client was notified by the NGL pipeline that they were going to be penalized for excessive methane (C1) in […]
RCE was involved with the design of a small refrigeration gas plant. In the span of a single week, RCE […]
During a plant visit, RCE engineers noticed that the Refrigeration Economizer was operating at a pressure very close to that […]
Lawsuit against a pipeline company alleging that delivered gas to the facility was above the 7 lbs H2O/MMSCF specification. This […]
RCE was supporting it’s client as owner’s process engineer on a large project. During early P&ID reviews RCE noted to […]
RCE engineers visited a new client’s plant that was originally built as a Residue Recycle (RR) process around 30 years […]
During start-up, the column was flooding and carry-over was evident. The latent heat of evaporation of the liquids carried over […]
Prolonged bypassing of the expander in JT mode led to thermal stresses that caused a plate-fin heat exchanger to fail […]
So I recently got into an web posting discussion that ended up amusing me. Someone posted a question about converting […]
Performed preliminary engineering and cost estimating for expanding an existing 55 MMSCFD cryogenic gas plant to 65 MMSCFD and improving […]