Skip to content
River City Engineering
  • About US
  • Services
    • Conceptual Studies
    • Project Engineering
    • Capacity and Debottlenecking Studies
    • Process Optimization
    • Process Safety Management
    • Pipeline Simulation and System Optimization
    • River City Software
    • River City Education
  • Our Team
  • Recent Work
    • Performance Testing
    • Plant Optimization
    • Safety Analysis
  • Clients
  • Blogs
    • Papers
    • Adding Value #16
    • Adding Value #15
    • Adding Value #14
    • Adding Value #13
  • Contact
  • About US
  • Services
    • Conceptual Studies
    • Project Engineering
    • Capacity and Debottlenecking Studies
    • Process Optimization
    • Process Safety Management
    • Pipeline Simulation and System Optimization
    • River City Software
    • River City Education
  • Our Team
  • Recent Work
    • Performance Testing
    • Plant Optimization
    • Safety Analysis
  • Clients
  • Blogs
    • Papers
    • Adding Value #16
    • Adding Value #15
    • Adding Value #14
    • Adding Value #13
  • Contact

Author: admin

Kentucky Hydrocarbons/DPI

Posted on June 11, 2010September 23, 2010 by admin

Performed preliminary engineering and cost estimating for expanding an existing 55 MMSCFD cryogenic gas plant to 65 MMSCFD and improving […]

Enogex – Harrah Gas Plant

Posted on June 11, 2010September 23, 2010 by admin

Performed detailed evaluation of a 12 MMSCFD cryogenic gas processing facility and determined the bottlenecks to processing up to 18 […]

DuPont – Sabine River Works

Posted on June 11, 2010September 23, 2010 by admin

Performed detailed capacity study on an existing high recovery cryogenic expander plant located in Texas. Determined sequential plant bottlenecks enabling […]

Phoenix Park Gas Processors – Phase I & II Ethane Recovery

Posted on June 11, 2010September 23, 2010 by admin

Process design for the conversion of two expander plants processing a total of 1,350 MMSCFD of gas located in Trinidad […]

Phoenix Park Gas Processors Limited – Phase II Expansion

Posted on June 11, 2010September 23, 2010 by admin

Process design, detailed design, and construction/startup support for a 600 MMSCFD expander plant located in Trinidad & Tobago.

ConocoPhillips – Empress Gas Plant

Posted on June 11, 2010September 23, 2010 by admin

Detailed process design support for the expansion of an existing 2400 MMSCFD ethane recovery expander plant.

Conoco – Belanak FPSO

Posted on June 11, 2010September 23, 2010 by admin

Unique process design of a high propane recovery expander plant to be installed on a FPSO (floating production storage off-loading) […]

PDVSA/BVPI – Lama Platform

Posted on June 11, 2010September 23, 2010 by admin

Startup/commissioning support for a 125 MMSCFD expander plant located off-shore Lake Maricaibo, Venezuela.

Conoco – DEZ Gas

Posted on June 11, 2010September 23, 2010 by admin

Detailed process design support and on-site startup assistance for two recovery plants (one J-T and one refrigeration) processing a total […]

Beware the Pitfalls of CO2 Freezing Prediction

Posted on March 1, 2005September 23, 2010 by admin

“Beware the Pitfalls of CO2 Freezing Prediction“ Chemical Engineering Progress, Vol. 101, No. 3, March 2005.

Posts navigation

Older posts
RCE | 4830 BOB BILLINGS PARKWAY, SUITE 100B | LAWRENCE, KS 66049 | PHONE: 785.842.4783 | FAX: 785.842.1450